The Iqbal Cash & Carry Rochdale is a supermarket located downturn Rochdale. Recently, the supermarket had to be closed after rodents were found inside. The problem is that the building is not poor deplorable conditions. Although there is an attempt to increase measures to ensure that the future infestations are prevented, it is clear that the possible future changes cannot be adopted without a major renovation plan. Although there are efforts to ensure that the possible hygiene standards are met, it is clear a major renovation will means a thorough cleaning up of the internal closets.

Trust banner

Is your time best spent reading someone else’s essay? Get a 100% original essay FROM A CERTIFIED WRITER!

Identify any key issues that might affect the building (exposed site, listed building etc.) and

Maintenance of the Building

Control

Under statutory duty as defined under Section 66 of the Planning of the Listed Buildings and Conservation Areas of 1990, there is a special concern of the desirability and preserving the building of its special features and historic known interface. The government encourages the general preservation as listed under the possible alteration or the possible demolition. Under the City of Rochdale by laws, it is clear that the special architectural statutory list encourage

Principles of Selection

The possible principles of selections are a composition of various architecture interests and reflect to the most important architectural design. The goal is to achieve the appropriate craftsmanship, decoration and have significant forms based on the historic interests of the buildings. There is a need for the social, cultural and economic history. The need is based on the group value. Besides, making an application for the building consent depends naturally on the building concept. The planning permission and advertisement depends naturally on the ability to create a design. The planning and reception of civic office are based on the application drawing that show how accurate the plan is using the existing building and proposed alterations. The planning indicates the extent and the removal of existing features of the fabric and the buildings. The decorative features should be of good and high quality. Given that the building will be retaining its old look, it will be important to focus on the alteration and refurbishment of the building outlook.

List of defects that need to repaired before the schedule can start (only identify the defect;

There are several key issues that should be considered so that the building can be renovated. Firstly, we have to consider that the supermarket has a busy schedule. Hence, we need to temporary halt operations, move inventory to a store hired downtown so that we can square the renovation plan. In this case, it will be important to figure out the stages, assumptions and exclusions that will be considered during planning for an upgrade. Also, another major issue is to consider the medium used. The supermarket is old where timber and concrete dominated the technology by then. Hence, there is a need to focus on the possible external moisture problems.

The introduction of new construction materials significantly improved the changes and design of the layout plan primarily because they enabled the adoption of durable materials. There is a need to consider the performance, and most likely the various materials that are going to be used to ensure that the building is stable.

Besides, before undertaking any procedure of renovation it will be important to consider the possible key issues surrounding the building. To begin with, as from Figure 1, the spacing/ indoor and outdoor replacement from the West Side require to be changed. The problem is that when that door is on that side, there is a major obstruction of bringing in inventory and people shopping. Other possible alterations to the original design include

Arrangement of the rooms,

Number of ventilators

Number and size of windows

Organization of cabinets and fridges

Sanitary services

Flow of water

Heating and electrical management

Structural weakness

Rodents and other unhygienic inhibitors are common because of the structure problems surrounding the building. To begin with the building suffers possibly inadequate bracing and the unsafe chimneys. This are the possibly hideouts positions. As you can see from figure 2, the rodents might be hiding from this place hence our work will be to remove this chimney as for now we do not need it.

Moisture

Also, the issue of moisture will be dealt with because it makes the building look dump. The building was built around World War II. The problems are that during this time, there were lack of the appropriate weather-tightness considerations hence the renovations will focus predominantly in reducing the internal moisture problem.

Matching new to existing

Besides, there is a problem of framing sizes, molding and roof profile which features the need to replace the possible new constructions. The roof was held considerably. Also after checking the buildings have a tightly lower ceiling, this increasing the dampness of the building. Hence, it is necessary to focus on the need to respond to this construction difficulty by introducing the appropriate framing size.

Insulation

Also, after checking thoroughly confirm from figure 1 the building does not have any special insulation features hence it will be necessary to figure out the problem facing the building by considering the kind of the climate that occupants are subjected to.

Water pressure

Besides, there is a need to focus on the hot water systems which will involve upgrading the entire plumbing systems. If you look at figure 5, the washrooms are in absolute deplorable conditions. Although there is a supermarket policy of attempting to keep them clean on daily basis, the effort is not successful enough as water is still leaking from old pipes.

Old wiring

Besides, the building has absolutely old wiring primarily because of the TRS and the peeling off quotes. The remaining original sections are a poor replacement of the entire aspect of the building.

Foundations and subfloors

If you check on figure 6, the foundational floor and the roof is facing significant challenges primarily because of its unevenness which is a result of corrosion on the need to reinforce the material. The subfloors are not properly arranged because of the long periods of stepping on them, they have colluded. A new and thorough improvement should be done on them.

Roofing

The roof from outside does not have any major changes, however there are possible leaks. Besides, from the inside, there is major network of the spiders. The roof needs a major overhaul bringing in new and stronger types of roofing types.

Wall cladding

Besides, there is a major need to maintain the roof in a good condition by ensuring that the claddings are well dressed in this case the room does not suffer any possible setbacks attributed to corrosion, however the front sections will need a major replacement.

Internal walls and ceilings

Also, there are major issues with the internal walls. If you check figure 8, the internal walls will need major paint upgrade. However there is a need to check whether there are any cracks and whether the water leaks could have affected. If so, these sections will have to be removed and replaced with new material. There should be a wall separating the store and the main service area, because this is where the rodents are taking advantage from.

Windows

The windows have been repaired whenever damaged; however, the windows should now be bigger because the stall need maximum light. The whole front face will have to be overrun paving way for larger windows. With such light, it is impossible to have rodents attacking the place

Health risks: asbestos

Besides, there is a major need to remove the asbestos claddings that are currently in use for the textured ceilings. The old materials containing asbestos should be removed because it has become airborne and breathed in. Additionally, the asbestos were made of lead which is a larger health hazard if inhaled. Hence, the entire cladding will have to be brought done paving in way for more fine materials.

Fire safety

Besides, there is a need to consider the designing of fireplaces. Currently the supermarket does not cook; however there could be possible accident caused by visitors, explosive or even shot circuiting hence there should be 16-18 Fire cylinders.

Specify the repair strategy

Clear maintenance plan listing all the key exterior elements and the type of maintenance

task involved:

o the list can be divided via either building element or via time frame (i.e. weekly,

monthly, seasonally, annual and five year tasks)

o for each task the building element should be identified with image and location and

the maintenance task involved.

o time frames of additional inspections and who should carry out the inspection should

be included.

A critical evaluation of how the proposed maintenance plan will reduce the amount of defects

and the benefits of preventative maintenance.

Bibliography and references

Cite this page

The Iqbal Cash & Carry Rochdale Maintenance of the Building - Paper Example. (2021, Jun 17). Retrieved from https://midtermguru.com/essays/the-iqbal-cash-carry-rochdale-maintenance-of-the-building-paper-example

logo_disclaimer
Free essays can be submitted by anyone,

so we do not vouch for their quality

Want a quality guarantee?
Order from one of our vetted writers instead

If you are the original author of this essay and no longer wish to have it published on the midtermguru.com website, please click below to request its removal:

didn't find image

Liked this essay sample but need an original one?

Hire a professional with VAST experience!

24/7 online support

NO plagiarism